Lake Geneva Geothermal Project

TEC partnered with a local engineering firm and contractor to design the best in comfort and energy efficiency for a residential project located in Fontana, WI.

TEC Territory Manager, Jose Ronchetta, worked extensively with a highly professional consulting engineering firm. The firm specializes in mechanical and electrical engineering for buildings, focusing on green and energy conservative designs. After many hours of consulting and engineering work, the job was ready for installation.

The impressive installation was completed by Ridgeway Home Services, a heating company that services the greater Chicagoland area. Ridgeway is considered a hydronics heating expert but also services and installs many other types of equipment, making it right for this project.

Project Quick Facts      

  • Location: Fontana (Lake Geneva) WI
  • Size: 24,000 Sq Ft
  • Tons: 55
  • Solder Joints: Over 200
  • Bore Holes: 22
  • RAUGEO Pipe Used: Over 8,000 Ft                                      

Equipment Highlights

  • Carrier Geothermal Splits
  • Carrier Fan Coils
  • RAUGEO Geothermal Pipe
  • Carrier Flow Centers
  • Grundfos Magna 3 Pumps

For more information about this project, contact Greg Joutras at 815-531-7414 or greg.joutras@tecmungo.com.

What the Mechanical Hub video series on the Fontana, WI project:

Oct. 29, 2015 – Fontana, WI Geothermal Project

Nov.4, 2015 – Video Teaser

Nov.11, 2015 – Carrier Geothermal Project

Nov.18, 2015 – Grundfos Magna Circulators

Nov.23, 2015 – REHAU PEXa Tubing